Construction Material Cost Estimator

Total material budget from up to five material lines, with waste allowance, delivery and sales tax.

Inputs

%
%

Results

Total estimate
3,536.25
Materials
3,225
Waste allowance
161.25
Tax
0

Formula

Materials = Σ quantity × unit price

Subtotal = Materials × (1 + waste) + delivery

Total = Subtotal × (1 + tax)

Assumptions & limits

  • Any currency — keep all prices in the same one.
  • Example lines: concrete (m³), rebar (t), blocks (pcs). Leave unused lines at 0.
  • Labour and equipment are not included.

Worked example

1,320 + 1,425 + 480 = 3,225 + 5% (161.25) + 150 delivery = 3,536.25.