Production Batch Costing

Total batch cost and cost per good unit from materials, labour, machine time, setup, overhead and scrap.

Inputs

units
h
per h
h
per h
%
%

Results

Cost per good unit
1.4047
Total batch cost
6,812.6
Direct cost
5,924
Good units
4,850 units

Formula

Direct = materials + labour h × rate + machine h × rate + setup

Total = Direct × (1 + overhead)

Cost per good unit = Total ÷ (batch × (1 − scrap))

Assumptions & limits

  • Scrapped units carry full cost and no salvage value.

Worked example

4,200 + 704 + 720 + 300 = 5,924 × 1.15 = 6,812.60 ÷ 4,850 good = 1.4047.